Showing posts with label demeter. Show all posts
Showing posts with label demeter. Show all posts

Wednesday, 5 August 2009

Two steps forward, one step back

Two steps forward
Finished off the first of my Bluerose socks, complete with anatomically correct toes.
Bluerose sock 1

Bound off the top of Elena's Ice Queen. Once I actually read the instructions properly, it was all much easier.
Elena's Ice Queen

One step back
This weekend, I discovered that Demeter was not as finished as I thought. That centre split for the neckline is not centred, so there is some unravelling to do. I don't yet know what happened: current options are me messing up the counting or choosing the number for the wrong size (or something excitingly different).
Demeter screw-up



Two steps forward
I have two specialist referrals to deal with my tiredness problems.

I have new meds to try. They may not work, but at least I'm doing something rather than waiting for the appointments to materialise themselves.

One step back
Anxiety is creeping back, and it just makes everything more difficult. The tiredness doesn't help it, and everything has the potential to overwhelm.



At least I'm still ahead on the game!

Thursday, 30 July 2009

A trip, a strange car, and some knitting

I returned from my family visit with most of my sanity intact, and some knitting. Hurrah! Pass the champagne!

I find family visits very stressful, as criticism and bickering (or complete silence) are the preferred way of communication, but I think I did quite well this time round. Not *everything* I do was completely wrong! Having my own copy of the Dysfunctional Family Bingo as a lifeline also helped (my own card was based on this one).

I did eat delicious delicious food (although I found myself missing veggies by the end of the 4 day trip), and got lots of knitting done (not counting all the travelling, the 5 hr car trips will do that). And saw strange cars.

SDC10993s



On the knitting front, I finished most of Demeter. It needs to be checked for size, though. Demeter's construction, bottom-up with a provisional cast-on, allows for knitting extra if it's too short. I normally knit my tops too short, so I think I may do this from now on with all of them, provided the body is stockinette (see the TECHKnitter's explanation on why only stockinette).
Demeter detail


The 5 hour car journey was mainly devoted to knitting socks. I had done the ribbing on the plane, and I managed to do 10 pattern repeats on the car: 2 that I had to rip, and the 8 needed for the leg. We reached our final destination as I was getting to the start of the heel.
Bluerose socks WIP

This sock is going incredibly fast, and the yarn, cotton sock yarn from YarnAddict, is a dream: one of the softest yarns I've worked with. I'm really enjoying knitting them.

Sunday, 28 June 2009

Knit Goggles

Google has a feature, Mail Goggles, which allows you to set times of the week when you need to test your sobriety/wakefulness before sending an email, by answering some maths problems.

knit-goggles


I wish my knitting came with something similar. After knitting the all the waist deceases of Demeter, I decided I wasn't using the right needles, so ripped it all off and started with new needles. What would you know, two attempts later, I went back to the initial needles. The first cast on ended up twisted, the second progress only to discover all my decreases were wrong.
So I'm about to cast on again (it's not too late), starting a new ball of yarn, I think the current one needs a rest.